Precio FOB
Obtener el precio más reciente510 ~ 580 USD / Ton
|25 Ton Minimum Order
País:
China
N º de Modelo:
MJ001
Precio FOB:
510 ~ 580 USD / Ton Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
510 per Ton
Cantidad de pedido mínimo:
25 Ton
Detalle de embalaje:
packed in bundle, suitable for sea transport
El tiempo de entrega:
15 days
Capacidad de suministro:
20000 Ton per Month
Tipo de pago:
T/T, L/C, D/A, D/P
Grupo de productos :
Persona de contacto Ms. Manly
No.B6-4building, Oriental commercial street, Jinghai County, Tianjin. China, Tianjin, Tianjin
Scaffolding
Pipe
High tensile scaffolding pipes are
designed for pipes & coupler scaffolding.The pipes have hot
dipped galvanized surfaces finish so as to provide excellent
appearance with sufficient durability in such applications where
salty air or long term weather exposures are
inevitable.
Standard: BS********5 , EN***9 , EN ****9, JIS
G***4:***4
Steel
Grade: Q**5B ,
Q**5B , S**5JR , S**5JR, S**5, S**5JR, STK**0 /
STK**0
Surface: hot
dipped galvanized , electro galvanized ,painted, engraved
.
Packing: Packed
in bundles with several steel strips, two tags on each bundle,
Wrapped in waterproof paper
Test:: Chemical Component Analysis, Mechanical
Properties (Ultimate tensile strength, Yield strength, Elongation),
Technical Properties (Flattening Test, Bending Test, Blow Test,
Impact Test), Exterior Size Inspection, Hydrostatic Test, X-ray
Test.
Third party
inspection: SGS,
BV, Lloyds etc.
Size:
Outer diameter | Wall thickness | Length |
mm | mm | meter |
*8.***8.6 | 2.**2.5 | 1.***2 |
*8.***8.6 | 2.*5 | 1.***2 |
*8.***8.6 | 3.0 | 1.***2 |
*8.***8.6 | 3.2 | 1.***2 |
*8.***8.6 | 3.6 | 1.***2 |
*8.***8.6 | 3.8 | 1.***2 |
*8.***8.6 | 4.0 | 1.***2 |
*8.1 | 4.0 | 1.***2 |
*2.3 | 4.0 | 1.***2 |
País: | China |
N º de Modelo: | MJ001 |
Precio FOB: | 510 ~ 580 / Ton Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 510 per Ton |
Cantidad de pedido mínimo: | 25 Ton |
Detalle de embalaje: | packed in bundle, suitable for sea transport |
El tiempo de entrega: | 15 days |
Capacidad de suministro: | 20000 Ton per Month |
Tipo de pago: | T/T, L/C, D/A, D/P |
Grupo de productos : | black steel round pipe |