Precio FOB
Obtener el precio más reciente269241 ~ 269300 USD / Set ( Negotiable )
|2 Set Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
269241 ~ 269300 USD / Set ( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
269241 per Set
Cantidad de pedido mínimo:
2 Set
Detalle de embalaje:
-
El tiempo de entrega:
-
Capacidad de suministro:
100 Set per Month
Tipo de pago:
Other
Grupo de productos :
-
Persona de contacto dengyaowen
Wuhan, Hubei
It is mainly used in railway line construction, and has the functions of pillow replacement, square pillow, ballasting, excavation, tamping, trimming and lifting. With the dual-purpose running mechanism of highway and railway, the running speed is fast and the power is high, which is suitable for construction under various working conditions, especially for the working environment that requires long-distance back-and-forth operation, such as demolition of old stations and yards, pillow replacement of long bridges and tunnels, etc., including pillow replacement device.
País: | China |
N º de Modelo: | - |
Precio FOB: | 269241 ~ 269300 / Set ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 269241 per Set |
Cantidad de pedido mínimo: | 2 Set |
Detalle de embalaje: | - |
El tiempo de entrega: | - |
Capacidad de suministro: | 100 Set per Month |
Tipo de pago: | Other |
Grupo de productos : | - |