Precio FOB
Obtener el precio más reciente850 ~ 1850 USD / Set ( Negotiable )
|1 Set Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
850 ~ 1850 USD / Set ( Negotiable )Obtener el precio más reciente
Lugar de origen:
China
Precio de pedido mínimo:
850 per Set
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
Wooden case
El tiempo de entrega:
10 days after 30% advanced payment finished
Capacidad de suministro:
99 Set per Week
Tipo de pago:
T/T, Western Union
Grupo de productos :
Persona de contacto Mr. Daniel
Crane industrial park,, Changyuan, Henan
Model | Working platform size(mm) | Capacity | Height(M) | Size(mm) | deadweight |
ESJ*0.***1 | ***0****0 | **0kg | *1 | ***0****0****0 | ***0 |
ESJ*0.***2 | ***0****0 | **0kg | *2 | ***0****0****0 | ***0 |
ESJ*0.***4 | ***0****0 | **0kg | *4 | ***0****0****0 | ***0 |
ESJ*0.***6 | ***0****0 | **0kg | *6 | ***0****0****0 | ***0 |
ESJ*0.***8 | ***0****0 | **0kg | *8 | ***0****0****0 | ***0 |
No. | Stoppage | Reason | Elimination methods |
---|---|---|---|
1 | Working plate is unable to lift or cant lift |
1.Overload 2.Return valve is not closed hand pump check valve stuck, return failure hand pumps, gear pumps serious oil spill. 3.Gear pump is damaged,oil has no pressure. 4.Hydraulic oil shortage 5.Short circuit 6.Blocking filter 7.Supporting valve or solenoid switching valve works failure A.Input voltage of electromagnet coil cant reach **0V. B.electromagnet coil burnt out. C.Valve stuck |
1.Lighten
load. 2.Tighten the oil return valve 3.Unscrew the oil port bolt valve, Overhaul, clean 4.Replace clean hydraulic oil. 5.Replace pump seals 6.Replace gear pump 7.Add enough hydraulic oil 8.Check contacts and fuses, etc. 9.Replace or clean *0.Repair or replacement |
2 | Oil leak |
1.loose
connection 2.Sealing ring damage |
1.Rugged spilt oil at the
joints 2.Repair or replacement |
3 | Table decline |
1.Valve closed
lax 2.Connection part between tube or valve oil leakage. |
1.Tighten the valve or
repair 2.Check and replace |
4 | Table drop not smoothly |
1.Load overload, causing deformation of
rail bracket. 2.Severe partial load 3.Rail brackets and other severe deformation caused by the accident. 4.Clip gas oil. 5.Dirty oil. |
1.Lighten the load for
maintenance 2.Adjust the load center of gravity 3.Overhaul 4.Add enough hydraulic oil 5.Replace hydraulic oil |
País: | China |
N º de Modelo: | - |
Precio FOB: | 850 ~ 1850 / Set ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | 850 per Set |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | Wooden case |
El tiempo de entrega: | 10 days after 30% advanced payment finished |
Capacidad de suministro: | 99 Set per Week |
Tipo de pago: | T/T, Western Union |
Grupo de productos : | Scissor Lift |