Precio FOB
Obtener el precio más reciente|
1 Set Minimum Order
País:
China
N º de Modelo:
sz
Precio FOB:
Lugar de origen:
China
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
fumigation wooden case
El tiempo de entrega:
3 months
Capacidad de suministro:
5 Set per Month
Tipo de pago:
T/T
Grupo de productos :
Persona de contacto Aaron
No.12 West Xin Jing Road, Economic Development Zone (South area),, suzhou, Jiangsu
Features:
1.Wide range of voltage-regulate. Secondary voltage of differential voltage levels meets the arc furnace steel-making process requirements.
2.High-voltage has no restriction of switching insulation level, and it (e.g. **0kV) can be reduced to low-voltage directly, eliminating the intermediate substation and saving more than *0% invested.
3.Easy to choose suitable voltage-level load tap changer, economic and safe.
4.It can be accessed compensation capacitor in order to improve network power factor.
5.The main transformer works in constant flux density. Make full use of materials and have a good conservation.
6.Using the same reverse-phase parallel, electric (or magnetic) shielding, transposed conductors and so on to reduce losses and improve efficiency.
7.A separate voltage coil is used so that ampere-turn balance is good, coupled with cylinder pressure nail structure, its ability to withstand short-circuit is also increased and has high reliability.
8.Using third breaking off instead of primary breaking off so that it can be achieved with low price and high life of low-voltage circuit breakers instead of high price and low life of high-voltage circuit breaks.
Take ****0/**0 arc furnace transformer for example, the load loss, no-load loss, no-load current is dropped *3%, *7%, *6% compared with the original product respectively. It is a real energy-saving emission reduction innovative product.
País: | China |
N º de Modelo: | sz |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | fumigation wooden case |
El tiempo de entrega: | 3 months |
Capacidad de suministro: | 5 Set per Month |
Tipo de pago: | T/T |
Grupo de productos : | transformer |